Falsified Medicines Directive 2011/62/EU was published by the European Parliament on 08-Jun-2011. The Directive was implemented to increase the security of the manufacturing and delivery of medicines across Europe, protect patients and prevent falsified medicines from entering the supply chain. Commission Delegated Regulation (EU) 2016/161 details the characteristics of the safety features, how medicine authenticity should be verified and by whom. The delegated Regulation, and the new medicine verification system it details, became effective on 09-Feb-2019. Regulation 2016/161 article 16.2, 23 and 25 pertain to the verification, decommissioning and re-commissioning of commercial serialized packs. There is no current industry standard to determine how this regulation impacts the packaging, labelling and distribution (PLD) of commercial products used in clinical supply chains and who is responsible as manufacturer at multiple processing stages in the supply chain. ISPE task team is aiming to understand and share experiences from industry post implementation of the regulation and to seek continuous feedback with the long term aim of aligning approaches within the IMP community of practice.
According to Art. 16.2, manufacturers have to execute two key operations on the commercial packs prior to repackaging or relabeling them for use in CTs:
Commission Q&A #1.6 indicates FMD requirements “apply up to the moment it becomes known which batch/unit will be used for research and development trials”. It is not clear that interpretation is consistent across member states.
Art. 16.2 addresses responsibilities of manufacturers holding both commercial and IMP Manufacturing Authorizations, however there is no explicit information about when commercial material entering the clinical supply chain, for use as IMP, has to be decommissioned and kit integrity verified or by whom this activity should be completed, considering the complexity and variability of clinical supply chains.
Depending on the supply chain configuration, different scenarios could be considered relative to product decommissioning. As the majority of products intended for use in CTs are sourced by the sponsor through a supplier (wholesaler / manufacturer) for repackaging and relabeling as IMP, this will be considered in detail below. This configuration offers three scenarios:
At this time, various stakeholders involved in CT supply chains confirm lack of consistent interpretation by the industry, resulting in operational inefficiency. In some instances, packs received by wholesalers are already decommissioned by the manufacturers, others are not; some sponsors expect to receive decommissioned packs.
The Task team would be interested in hearing feedback you may have on the topic in order to assemble a guidance document intended to drive a consistent approach. Please use the comments section below to share responses to the questions and help to support future discussion on the topic:
Links to regulations:
Through the ISPE Foundation Professional Development Grant program, Silas Tamufor attended the 2023 ISPE Annual Meeting & Expo in October 2023. Tamufor is a PhD student and ISPE Boston Chapter member who began serving as the ISPE Boston Educational Programs Committee Chair in December 2023. He, along with 87 other students and recent graduates, attended the conference thanks to the...
To meet the biopharmaceutical industry’s duty to manufacture safe and effective therapies for patients, a robust quality system is fundamental to success. A quality system should link to quality culture and prioritize focusing on quality, led by management, that fosters sustainable compliance and consistent production of high-quality drugs. Strong quality culture attributes include a proactive...
Stability sampling and testing are key to ensuring that products maintain safety, identity, strength, purity, and quality throughout their claimed shelf life. It is also a regulatory requirement per ICH Q5. However, storing product samples in different environmental conditions, testing those samples for three to five years (or more) after initial manufacture, and properly analyzing and...