At first glance, ready-to-use (RTU) primary packaging material (tub systems) give production lines more flexibility and reduce container preparation complexity for aseptic fill/finish operations. However, the aseptic introduction of RTU tub systems requires a thoroughly designed transfer process to avoid contamination of the sterile RTU items and the aseptic core.
Technical